Ordering, Samples, MOQ & Lead Times

B2B Ordering & Production Planning

Planning a surgical instrument order starts with product specifications, quantities and delivery requirements. EndoTech works with importers, distributors and instrument brands to review requirements, prepare quotations, arrange samples where needed and plan production against the agreed order.

This guide explains the information to prepare, how minimum order quantities are determined and which commercial details should be confirmed before you approve an order.

Product-Specific MOQ Sample Review Written Quotation International B2B Supply
Surgical instruments inspected before order packing and shipment at EndoTech
From Enquiry to Shipment Confirm the product specification, quantity, sample status, commercial terms and delivery plan before the order proceeds.
The Ordering Process

Six Stages From Enquiry to Delivery

A clear order process helps both parties confirm what will be supplied, how it will be inspected and when it is expected to be ready for shipment.

01

Enquiry & Product List

Identify the instruments, references, quantities and destination market. Attach drawings or reference images if the order involves a specific product configuration.

02

Technical Review

Confirm the applicable product specification, material, dimensions, finish, sample requirements and any special packaging or labeling details.

03

Written Quotation

Review the proposed pricing, MOQ, sample charges if applicable, payment terms, estimated production timeline and delivery arrangements.

04

Sample & Approval

Where a sample is required, review the product against the agreed requirements and record any changes before authorizing production.

05

Production & Inspection

Manufacturing proceeds against the confirmed order. Applicable quality checks are performed before the finished goods are released for packing.

06

Packaging & Shipment

The completed order is packed according to the agreed requirements and prepared for dispatch under the confirmed shipping arrangements.

Before Production Starts

What Happens After You Contact EndoTech?

The process is built around clarifying the order before production begins. The exact steps depend on whether you are ordering an established instrument, a repeat product or an OEM specification requiring sample approval.

Step 01

Submit Your Requirements

Send the product list, catalogue references, quantities, delivery destination and target schedule.

Step 02

Confirm Specifications

Review dimensions, materials, finish, product configuration and any required sample or reference approval.

Step 03

Review the Quotation

Check the prices, quantities, commercial terms, sampling costs where applicable and estimated schedule.

Step 04

Approve the Order

Confirm the order specification and written commercial terms before authorizing the next stage.

Step 05

Produce Samples if Needed

Arrange sample production when the project requires evaluation of the product before the main production run.

Step 06

Approve the Reference

Record sample approval and any agreed specifications before production is authorized.

Step 07

Manufacture & Inspect

Produce the confirmed order and complete the applicable inspection and quality checks.

Step 08

Prepare for Dispatch

Confirm packaging, shipping arrangements and the commercial documents agreed for the shipment.

Request an Accurate Quotation

What to Send for Pricing and Production Planning

A detailed initial enquiry helps EndoTech evaluate the product requirements and quote the correct quantity and specification.

Include These Details in Your Enquiry

You do not need a complex procurement package to start. A clear product list and the information already available to your team are a useful starting point.

  • Product name, catalogue reference or SKU
  • Quantity required for each item
  • Technical drawing or reference sample, if applicable
  • Material, dimensions and finish requirements
  • Sample requirements and approval criteria
  • Destination country and delivery postcode or city
  • Required delivery date or target schedule
  • Packaging, labeling and documentation requirements

If you are sourcing several product categories, attach a spreadsheet listing the product reference, quantity and any special requirements for each line.

Browse the EndoTech product catalogue →
Milling and precision machining in EndoTech surgical instrument production
Product requirements and technical details help the manufacturing team assess the order before confirming pricing and timing.
Minimum Order Quantity

How EndoTech's MOQ Is Determined

Minimum order quantity is product-specific. The right figure depends on the instrument, quantity per SKU, manufacturing requirements and the scope of customization.

Standard Product Orders

For established instrument models, the quotation should specify the minimum quantity for each product or SKU. MOQ may differ between instrument types and product families.

If an order contains many SKUs, ask whether each line has its own minimum or whether a larger combined order can be planned across the product range.

OEM & Customized Orders

For orders based on customer drawings, reference instruments or special requirements, MOQ may depend on manufacturing complexity, sampling, tooling or other project-specific needs.

A quotation should clarify the minimum quantity and any setup or development charges before you approve production.

Published reference: EndoTech's current OEM ENT page lists a typical MOQ of 100–500 units, depending on product type and customization. Other product-category pages describe MOQ as dependent on the instrument and production requirements. This ENT reference should not be assumed to apply to every SKU. Request a written MOQ for your actual product list.
Samples & Approval

When Should You Request a Sample?

Sampling is useful when the buyer needs to review a product before authorizing the production quantity. Whether a sample is needed should be agreed during quotation.

Existing Instrument Reference

If you already know the instrument you need, provide the catalogue reference, product details or an existing sample. The team can review whether a pre-production sample is appropriate for your order.

OEM Specification Sample

For orders based on customer dimensions, material, finish or working characteristics, a sample can help the buyer check the agreed requirements before the main run.

Buyer Approval

Agree what the buyer will evaluate, how approval will be recorded and whether any changes are needed before production is authorized.

Sample charges and timing: Sampling fees, tooling or setup charges, courier costs and sample-production timing should be confirmed in the written quotation. Do not assume that samples are free or that a sample can be dispatched within a fixed number of days.
Production Planning

MOQ & Lead Times by Order Type

Production timing depends on the product and order scope. Use the following as a planning guide, then confirm the actual schedule in the quotation before committing to a customer delivery date.

Order Type MOQ Consideration Lead-Time Consideration What to Confirm
Established Instrument / Repeat Order Minimum quantity per product or SKU. May be simpler to schedule when the specification is unchanged and any sample approval is complete. Quantity, materials, availability, production slot and shipping plan.
First Order Requiring a Sample Confirm the product minimum and any separate sample requirements. Allow for sample preparation, buyer evaluation, any agreed revision and subsequent production. Sample charges, sample timeline, approval process and the start of the production lead time.
OEM / Customized Specification Depends on instrument configuration, production requirements and agreed quantities. Technical review or design changes can add time before production is ready to begin. Feasibility, specification approval, setup needs and confirmed delivery schedule.
Large / Multi-SKU Order Each SKU may have a different minimum or manufacturing requirement. Different products may need separate production schedules or staged completion. Product mix, partial shipment requirements, combined packing and dispatch arrangements.
Indicative lead time published by EndoTech: Some OEM product-category pages show a typical production window of around 2–6 weeks, while the ENT OEM page lists 3–6 weeks. These are references for planning, not a guaranteed timeline for all instruments. The confirmed lead time depends on product complexity, order quantity, sampling, specification approval and production scheduling.

The written quotation should clarify when the lead-time clock starts, what approvals or payments are required first, and whether the estimate covers production only or also shipping.
Commercial Terms & Delivery

Confirm the Full Cost Before Approving Your Order

The quotation and order confirmation should state the commercial terms clearly so both parties understand what is included in the price and what happens next.

Pricing & Sample Charges

Ask for the price by SKU and quantity tier where applicable, with any additional charges shown separately.

  • Unit prices and quoted quantities
  • Sample or setup charges, if applicable
  • Tooling or development costs, if applicable
  • Packaging or labeling charges, if requested
  • Quote validity and currency

Payment & Order Approval

Payment terms should be written into the quotation, proforma invoice or formal order confirmation.

  • Required deposit or advance, if applicable
  • Balance-payment timing
  • Accepted payment method
  • Any payment milestone linked to sampling or production
  • Written approval required before production

Packaging & Shipping

Agree the delivery arrangement and the costs that will be included in or added to the goods quotation.

  • Bulk or other agreed product packaging
  • Requested labeling or identification
  • Available shipping method and destination
  • Freight, insurance and delivery responsibility
  • Export and shipment documents, where applicable
Commercial policy: EndoTech's public pages do not establish one universal sampling fee, payment schedule or shipping term for every order. These details should be confirmed in the quotation or proforma invoice before payment or production is authorized. Import duties, taxes, customs charges and any other destination-specific costs should be clarified as part of the delivery arrangement.
Measurement checking of surgical instruments at EndoTech
Repeat Orders & Replenishment

Make Repeat Purchasing Easier With Approved Specifications

For repeat orders, identify the same product reference and approved specification used previously. This helps the buyer and manufacturer review the new quantity without starting every technical discussion from the beginning.

Do not assume that a repeat order has the same price or delivery date as the previous order. Confirm any specification changes, current MOQ, production scheduling and commercial terms before placing the new purchase order.

  • Reuse the agreed product reference and specification
  • Identify changes to quantity, finish, material or packaging
  • Confirm current price and MOQ
  • Confirm the new production and shipment schedule
  • Record any new sample-approval requirement
Before You Approve the Purchase Order

Check These Details in the Final Quotation

Use this checklist before approving production or arranging payment. Any unresolved point should be clarified in writing.

Product & Quality

  • Correct product names, catalogue numbers and quantities
  • Agreed dimensions, materials and finish
  • Sample requirement and approval status
  • Inspection requirements and available records
  • Packaging and product-identification requirements

Cost & Delivery

  • Unit prices, currency and quote-validity period
  • MOQ and any sample/setup charges
  • Payment terms and milestones
  • Estimated production lead time and start condition
  • Shipping method, freight responsibility and documents
Ordering FAQ

Frequently Asked Questions

Answers to common questions about ordering surgical instruments from EndoTech.

How do I place a B2B order with EndoTech?
Send the product list, catalogue references, quantities, destination market and any technical requirements. EndoTech can review the request and discuss the applicable quotation, MOQ, sample requirements, production schedule and delivery terms.
What is the minimum order quantity for surgical instruments?
MOQ depends on the product, quantity per SKU, specifications and manufacturing requirements. EndoTech's current OEM ENT page publishes 100–500 units as a typical reference for that category; buyers should request a product-specific MOQ for other instruments.
Can I order samples before placing a bulk order?
Sample production can be arranged where required by the project, subject to technical review and agreed commercial terms. Confirm the sample cost, production time, shipping charges and approval process in the quotation.
Are samples free?
Do not assume that samples are free. Any sample charge, tooling or setup costs and courier charges should be confirmed in writing for the particular project.
How long does production usually take?
EndoTech's current category pages publish indicative lead times of around 2–6 weeks for some OEM orders and 3–6 weeks for ENT OEM orders. Actual timing depends on the instrument, quantity, sample approval, specifications and production schedule. Confirm the delivery estimate in the quotation.
When does the production lead time start?
Confirm the start condition in the written quotation. Depending on the project, the schedule may depend on specification approval, sample approval, order confirmation or the applicable payment milestone.
What details should I send to receive a quotation?
Send product names or SKUs, quantities per item, drawings or reference samples where relevant, material and finish requirements, packaging needs, destination country and target schedule.
Can EndoTech handle multiple instrument SKUs in one order?
Buyers can submit a multi-SKU product list for review. MOQ, lead time and pricing may differ by instrument, so the quotation should specify each product line and any staged production or shipment arrangements.
What payment terms does EndoTech offer?
Payment terms should be confirmed directly with EndoTech and recorded in the quotation or proforma invoice. Do not assume a deposit percentage, balance-payment timing or specific payment method without written confirmation.
What shipping options are available?
Discuss the destination, order size, delivery schedule and preferred shipping method with EndoTech. The quotation should confirm the available arrangement, freight cost, delivery responsibility and the shipment documents that are included.
Can I place repeat orders using an approved specification?
An approved specification can be used as the reference for discussing repeat production. The new order should still confirm current pricing, quantities, production timing, packaging and any specification changes.
How do I start an order for the USA market?
Send EndoTech your instrument list, intended U.S. market, estimated quantities, technical requirements and delivery destination. Discuss current product documentation and shipment requirements alongside the quotation.
Start Your Order Enquiry

Ready to Discuss MOQ, Samples & Production Timing?

Send EndoTech your product list, quantities, specifications and destination. The team can review your requirements and confirm the quotation details, applicable MOQ, sample arrangements and estimated production schedule.

General enquiries: info@endotech.com.pk  |  Customer service: ghafar@endotech.com.pk  |  +92-52-4352088